The lifecycle of a new construction project can last several years. Initial goals are set by the team with high aspirations but are often deviated from as the process continues.
Tracking and monitoring the project’s energy goals through design deliverables, energy analysis and commissioning reports is crucial for adhering to objectives. However, what happens when unforeseen issues occur? Does the team achieve the owner’s aspirations?
This presentation reviews achieving client goals while working through obstacles, from design inception through occupied building. Working together as a high performance team, performance goals can be achieved and confirmed through post-occupancy measurement and verification.
1 Architect and Engineer: An Evolving Relationship Required for Synergy within Sustainable Design
The relationship between architect and engineer has evolved as sustainable design has gained importance. The design process between the team is less hierarchical and much more collaborative. Beyond the team’s reliance on engineers for technical expertise, they must also have a broader understanding of a project’s goals, as their input has a much greater impact than before. Today, the process of engineer more closely reflects the process of architecture, each relying on the other. Understanding the importance of integrating HVAC design and building envelope strategies into the early stages of the design process creates a synergy within architecture and engineering.
2 HVAC Design Options: Navigating Owners and Architects through HVAC Systems to Provide Client Specific Solutions
Every project and owner is unique. Some buildings are set out with goals to have the greenest building in the world while others are simply trying to provide adequate thermal comfort. There is a fine line between providing an adequate system while encouraging an owner towards an energy efficient design. And when and how do you bring the facilities engineer into the design process? This presentation covers how to present and tailor HVAC system design options to the owner, design team and facilities group, while addressing energy use concerns, architectural aesthetics, acoustical criteria, and operations and maintenance preferences.
3 Commissioning: Why Designers, Owners and Operators Should Care
Often the commissioning process is an after-thought that gets addressed when code compliance or LEED requirements are addressed. It is seen as a means to an ends instead of a key component of a high performance project. Through early integration of commissioning into the design process, projects experience reduced energy use, lower operating costs, reduced contractor callbacks, and verification that the systems perform in accordance with the owner’s requirements. Projects can only succeed when designers, energy analysts, contractors, owners and operators all understand the project goals, and commissioning is one of the most effective ways to bring all parties together.
4 Integrating Energy Analysis into Design: How to Ensure Predicted Energy Utilization Index Values Are Achieved
The most important key of true project success is a high performance team that communicates effectively and constantly tracks its goals. The design must be benchmarked throughout each phase of the project, including post occupancy. Working hand in hand with the design team, owner and facilities group allows the energy analyst to predict an Energy Utilization Index value which is reflective of future building conditions. And after a year of occupancy, a carefully thought out measurement and verification process will reveal the team’s successes and shortcomings.