This seminar considers the Glorya Kaufman International Dance Center at the University of Southern California LA project that was handed over in summer 2016. Working with the demanding, yet knowledgeable, technical facilities team the fully connected MEP BIM systems model was developed employing equipment manufacturers' BIM components with data rich component information. As well as delivering design detail the BIM provided record drawings with commissioning data and drastically reduced the RFIs compared the traditional design flow. The BIM model will be maintained by the on-site facilities team and updated to manage maintenance and to inform future refurbishment work.