What is the contractor to quote if the criterion engineer requests an incomplete system that may not be correctly sized for the project? The contractor is at risk to deliver a complete system, with all operational components from abridging documents that are purposely incomplete. This contractor is responsible to hire the design build engineer of record, responsible for a complete functional system after he has quoted a fixed cost for the system. In this example, relationships clouded best practice.