The process of energy metering a campus served by central plants always begins with a simple plan, to determine the energy consumption of each building. In practice, however, this strategy can take several years and millions of dollars to execute, with no guarantee that the data is accurate. Successful campus energy metering projects require an in-depth analysis of not just each utility serving a building but also the campus control system, utility distribution layout, and campus network infrastructure. 8760 Engineering has used a simple process to help our clients design, install, maintain and ultimately use accurate meter data.