2 Commissioning Documentation for Operations Management

John Gibbemeyer, P.E., George Mason University
Higher education projects are normally required to obtain a LEED certification. Embracing LEED requirements is challenging; but many are now convinced that it can significantly improve operations! LEED projects produce commissioning deliverables that are currently underutilized in bridging the gap to operations management. A higher level of awareness and improved implementation of the Final Commissioning Report and Systems Manual deliverables will greatly improve communication from schematic design through long term operation of the building. Developing an Owner’s Project Requirement (OPR) early will ensure that what is proposed in the design and constructed can be maintained well at a low cost.