The commissioning process for a central chiller plant includes full analysis of the plant's condensing water cooling tower. This includes a verification of unit capacity and proper installation, plus confirming it is started, tested, and balanced for design operating condition. This presentation includes the steps needed to ensure the cooling tower is fully commissioned to meet the Owner's Project Requirements and perform as designed.
See more of: Commissioning a Central Chilled Water Plant